MOQ, Tooling and Quote Lead Time for Deep Drawn Parts

For new tooling our minimum order is 1,000 pieces per part number, the die set is designed and built in-house, and we return a quote within 24 hours. Those three numbers describe a made-to-print service, not a catalogue: there is no price list, because the part geometry, the grade and the number of reductions decide the tool and the unit cost.

Key point: MOQ 1,000 pieces, tooling made in-house, quote in 24 hours — send the drawing with material, depth, wall and the functional tolerances and we return a stage plan, not a guess.

Why there is a minimum at all

A drawn part starts with a dedicated tool: punch, die, blank holder and, for many geometries, several reduction stages. That one-off cost is amortised over the life of the tool, so the meaningful question is how many parts you will buy over that life, not whether a nominal MOQ can be waived. Tool and die design explains the layout, and why one blank becoming one part lowers unit cost as volume grows. The forming route itself is classified under DIN 8584, summarised in the deep drawing process description and treated in forming-limit terms in ASM Handbook Volume 14B.

Prototype and short-run quantities can sometimes be accommodated depending on the drawing, and repeat orders on existing tooling can run in smaller batches. What we do not publish is a fixed price or a catalogue SKU: every part is quoted against its own stage plan. Our quality system follows ISO 9001 and stainless steel sheet is certified to ASTM A240/A240M.

What the 24-hour quote contains

Give us the finished diameter, depth, wall, alloy and temper, the dimensions that carry a functional tolerance, and the expected annual volume. We return the stage plan (first draw, redraws, ironing if needed, any intermediate anneal), the tooling scope, the inspection scope and the quote. Presses run 5–500 ton, draw depth is quoted to 150 mm, formed dimensions hold ±0.05 mm and ±0.02 mm after ironing. The numeric bands are stated once on the capacity page.

Because the die shop is in-house, a design change does not restart a supplier chain. That matters most on non-round shells and on parts with a sealing face, where the first sample often drives a small radius or flange change. Quality control describes how the first article and production parts are checked, and the Engineering Guides hub collects the design checks behind each decision.

What we do not promise

We do not publish prices, SKUs, leak rates, autoclave cycle counts or a fixed delivery date before the tool layout is agreed. We do publish the process envelope and the quote turnaround. If a geometry needs more reductions than the grade can take, or a fabricated or machined route is more honest, we say so in the review — see drawn vs machined vs welded. Founded in 2012 and registered in Hangzhou, we have built the tool shop around that made-to-print model.

Decision table

buying situation what we need from you what you get back
New part, new tooling Drawing, grade, temper, annual volume Stage plan, tooling scope and quote in 24 hours
Repeat order on existing tooling Part number and quantity Smaller batches are possible
Prototype or short run Drawing and target quantity Feasibility review against the existing tool family
Tight bore or sealing face Functional tolerances marked on the print Operations list separating formed, ironed and machined features
Non-round or very deep shell Corner radii and full geometry Stage plan with any anneal or redraw steps stated

Frequently asked questions

Can the 1,000 piece minimum be waived for a prototype?

Sometimes. Prototype and short-run quantities can be accommodated depending on the drawing, and repeat orders on existing tooling can run in smaller batches. The 1,000 piece figure applies to new tooling, where the die is a one-off cost.

What exactly comes back within 24 hours?

A stage plan, the tooling scope, the inspection scope and a quote. Not a shipment date: lead time depends on the tool layout, which is agreed after the drawing review. We state that distinction up front rather than quoting a date we cannot hold.

Which cost drivers prevent a catalogue figure for a made-to-print shell?

Every part is made to print. Blank diameter, number of reductions, grade, wall behaviour and inspection scope all change the tool and the unit cost. Publishing a price without the stage plan would be a guess, so we quote per drawing.

Does in-house tooling change the lead time?

It removes the supplier chain from design changes. When a first sample drives a radius or flange correction, the die is modified in the same shop that built it. We still do not publish a fixed delivery date before the tool layout is agreed.

Which drawing details most often delay a quote?

A missing temper, an undefined wall, and tolerances applied to every surface instead of only the functional ones. Alloy, temper, depth, wall, functional tolerances and annual volume are the five items that let us return a complete stage plan.

Is a fee attached to the 24-hour engineering review?

We do not publish prices or fees on this page; the quotation is issued against the drawing and states the tooling and inspection scope. No price, SKU or review figure is listed as a fixed catalogue value.

What we do not claim: We do not publish leak-rate figures, autoclave cycle counts, springback angles or furnace recipes that we have not measured on our own parts. The ±0.02 mm figure applies to ironing passes only, not to every geometry. 6xxx aluminium is used for shallow forming, not deep drawing. Prices, minimum order quantities and lead times are confirmed per drawing rather than published as fixed values.

Last reviewed: 2026-11-05 · Reviewed by Sam Zhang, Process Engineer. See the full Deep Drawing Engineering Guides hub for process comparisons, measured draw ratios and defect troubleshooting.