The Double-Tube Sensor Probes Welded Mounting Base Assembly is a probe built from two tubes – two sensing channels in one assembly – joined to a base that is welded on to mount the whole probe to a vessel or a flange. The double tube is there for redundancy or for two measurements at one location, and the welded base is there to hold both tubes rigidly and seal them to the mounting surface. Three things make this part more than the sum of two tubes: the two tubes have to be held parallel and at a fixed spacing, the welded base has to join both without distorting either, and the whole assembly has to seal at the base while both tubes stay clear inside. This page covers the double-tube geometry, the welded base and the sealing that ties it together.
Two tubes have to stay parallel, spaced and individually clear
A double-tube probe is only useful if its two tubes behave as a matched pair: parallel to each other, at the spacing the assembly expects, and each with its own clear bore for its own sensor. If the tubes converge, diverge or cross, the sensors do not land where the design put them, and if one bore is blocked or distorted the assembly has one good channel and one bad one. The relationship between the two tubes is therefore a primary specification, held by the base and by any feature that joins them along their length.
- Tube-to-tube spacing and parallelism are held, because both sensors have to land at their designed positions.
- Each bore is verified clear and consistent, because a double-tube probe with one blocked channel is a half-failed assembly.
- Where the tubes are joined along their length, the join is controlled so it does not pinch or distort either bore.
The welded base joins both tubes and has to do it without distorting them
The base is welded to both tubes and to the mounting surface, and welding is a heat operation – it puts heat and residual stress into exactly the fine tubes it is joining. A weld that is too hot or too constrained can distort a thin tube, pull the two tubes out of their spacing, or leave a heat-affected zone that becomes a corrosion or crack site. The welding of the base is therefore a controlled operation that has to join the tubes firmly while leaving their geometry and their bores intact.
- Weld heat and sequence are controlled so the tubes are not distorted or pulled out of spacing by the weld.
- Tube-to-base joints are inspected for the heat-affected zone and for any distortion of the bore near the weld.
- The base is verified flat and true after welding, because weld shrinkage can bow a base that was flat before the tubes went on.
The base seals to the mounting surface and has to stay flat under load
The base is the mounting and sealing interface: it bolts or welds to the vessel and it has to seal there, which means its mounting face has to be flat and stay flat once the assembly is installed. A base that is flat on the bench but bows when it is welded to the tubes, or when it is bolted down, seals at the fasteners and leaks between them. We hold base flatness in the welded and loaded condition, not just as a free-state dimension, because the welding and the mounting are what move it.
- Base flatness is verified after welding, because the weld is what disturbs a face that was flat before the tubes went on.
- The mounting face is re-checked after a representative bolt load where the base is bolted rather than welded to the vessel.
- Where the seal is a gasket, the land is held flat and continuous around both tubes, because both openings have to be sealed.
Sealing two tubes through one base is a two-opening problem
Because there are two tubes, the base has to seal two openings, and the sealing geometry around each has to work while the tubes stay at their fixed spacing. A gasket or a weld that seals one tube but not the other, or that seals both on the bench but leaks when the tubes are at slightly different heights, is a failed assembly. The two-opening seal is verified as a whole, with both channels proven, because a double-tube probe is only as sealed as its weaker opening.
- Both tube openings are sealed and both are verified, because the assembly leaks at whichever opening is weaker.
- Where the tubes are at slightly different heights, the base and seal accommodate that without one channel leaking.
- The whole base seal is tested as an assembly on the first article, proving both channels hold before the probe ships.
How we verify a double-tube welded-base probe assembly
Verification checks the two tubes, their relationship and the welded base that joins and seals them, because the assembly only works if all three agree.
- Individual tubes: bore, wall and length verified per tube, with each bore confirmed clear along its length.
- Tube relationship: spacing and parallelism between the two tubes confirmed against the assembly’s requirement.
- Welded base: joints inspected for distortion and heat-affected zones, with the bores near the welds checked for pinch or ovality.
- Base geometry: flatness of the mounting face verified after welding, and after a bolt load where the base is bolted.
- Seal check: both tube openings sealed and the whole base pressure-tested, proving both channels hold.
- Material and fit check: stainless steel grade and weld-fill records per lot, and both sensors inserted and seated before the assembly ships.
First articles and retention samples are kept for the programme, so a repeat assembly is welded and sealed to the same verified tube spacing and base flatness. On a probe whose value is two matched channels joined and sealed through one base, holding the tube relationship and the welded seal to a verified baseline is what keeps a second assembly mounting and reading as cleanly as the first.
Sensor Housings is the range this part sits under; the overview page pulls together the tooling logic, finishing options and tolerance notes that apply across the family.
Specifications
| Item | Double-Tube Sensor Probes Welded Mounting Base Assembly |
|---|---|
| Brand | AUNOV |
| Designing | A drawing file or a physical sample starts the review, DFM feedback is returned with the quote. |
| Tooling | Dies designed and built in our own toolroom, held and maintained under your part number. |
| Samples | First-off samples are sent with a full dimensional report and material certification. |
| Materials | Carbon steel (SPCC / DC01), 304 / 316 stainless steel, aluminium, brass and copper are stocked, per the drawing. |
| Surface finish | Zinc, nickel or chrome plating, e-coat, powder coat, anodising or passivation, selected against the drawing requirement. |
| Processing | Deep drawing in stages, in-line annealing where needed, then pierced and CNC-machined in house. |
| Equipment | Our press floor runs 5-250 T mechanical and 250-500 T hydraulic presses, CNC turning centres, climate-controlled CMM room. |
| Tolerance | +/-0.1 mm on as-drawn features, +/-0.03 mm on machined surfaces. |
| Delivery terms | Prices FOB, with DDP for EU and US on request, T/T and L/C; D/P on repeat accounts, call-off schedules and blanket orders supported. |
Frequently Asked Questions
What is hardest about putting two tubes on one assembly?
The relationship rather than the parts. Both tubes have to stay parallel, stay spaced and stay individually clear at the same time, which makes it a tolerance between features rather than tolerances on features. Measuring each tube correctly tells you almost nothing about whether the pair will assemble.
What goes wrong when the base is welded on?
Heat input moves everything. Both tubes and the base itself can shift, so parallelism drifts and the established spacing changes, and the distortion generally shows up after the joint has cooled rather than while it is being made. Fixturing and sequence are what keep it within tolerance, not inspection afterwards.
Why does the base have to stay flat once it is loaded?
It is doing two jobs on one surface: sealing to the vessel and reacting the clamping load. If it deflects between fasteners it lifts away at the low spots, and because both tubes pass through it, one compromise affects two circuits rather than one. Flatness under load is therefore the real requirement.
Why is sealing two openings harder than sealing one?
They share a single compression margin. Any unevenness in the clamped stack is divided between them, so improving one tends to unload the other. That interaction is absent on a single-tube assembly and is why a double base needs both its sealing faces considered together rather than separately.